The Westend bridge is part of the Berlin city highway that connects downtown Berlin with the airport in the north. The 38 years old structures is a pre-stressed concrete bridge. In the past the bridge had to be strengthened multiple times due to cracks and open connecting joints within the floor slab. After the reunification of Berlin the commercial traffic into the city increased considerably and, hence, doubts arose whether the bridge would sustain this new loading.

Download information (pdf format)

Leave a Reply

Your email address will not be published. Required fields are marked *

Categories
Contact Info
Praesent quis risus nec mi feugiat vehicula. Sed nec feugiat arcu.
  • ISHMII Administrative Center c/o University of Manitoba Department of Civil Engineering, A250 – 96 Dafoe Road Winnipeg, Manitoba R3T 2N2 Canada
  • central@ishmii.org