The Putlitz Bridge in Berlin, Germany, opened in 1977, is part of a main route for urban traffic which is also used for heavy loads. Currently the bridge is stressed by the transport of heavy gas turbines with maximum loads of 500 t, which is much more than the design loads. To ensure the bearing capacity experimental investigations including SHM have to be carried out.
Leave a Reply