The Herrenbrücke crossing the river Trave was built between 1962 and 1964. A new building, a tunnel, is under construction, and will be finished 2006. The Herrenbrücke bridge should remain in service up to that time. The highways department of the city Lübeck assigned a consultant engineer for a statement, which has to assess the life cycle of the bridge up to the year 2006.

Download information (pdf format)

Leave a Reply

Your email address will not be published. Required fields are marked *

Categories
Contact Info
Praesent quis risus nec mi feugiat vehicula. Sed nec feugiat arcu.
  • ISHMII Administrative Center c/o University of Manitoba Department of Civil Engineering, A250 – 96 Dafoe Road Winnipeg, Manitoba R3T 2N2 Canada
  • central@ishmii.org