Pioneer Bridge, Singapore, was completed in 1970 and upgraded by Land Transport Authority Singapore in 2000/2001. It carries heavy industrial traffic to and from Jurong Port and is rated to carry vehicles of 44 tonnes. Modal testing and short term strain/vibration monitoring was conducted before and after the upgrade to test the need for and effect of the upgrade.

Download information (pdf format)

Leave a Reply

Your email address will not be published. Required fields are marked *

Categories
Contact Info
Praesent quis risus nec mi feugiat vehicula. Sed nec feugiat arcu.
  • ISHMII Administrative Center c/o University of Manitoba Department of Civil Engineering, A250 – 96 Dafoe Road Winnipeg, Manitoba R3T 2N2 Canada
  • central@ishmii.org