The A14 Huntingdon Railway Viaduct is part of the Cambridge to Kettering section of the A14 dual carriageway.  The structure has been the subject of a Special Inspection that indicated the presence of voids, water and chlorides in the tendon ducts, but no significant corrosion of the strands.  A SoundPrint® acoustic monitoring system, designed by Pure Technologies Ltd of Canada was installed to monitor tendon wire break activity in one of the cantilevers.

Download information (pdf format)

Leave a Reply

Your email address will not be published. Required fields are marked *

Categories
Contact Info
Praesent quis risus nec mi feugiat vehicula. Sed nec feugiat arcu.
  • ISHMII Administrative Center c/o University of Manitoba Department of Civil Engineering, A250 – 96 Dafoe Road Winnipeg, Manitoba R3T 2N2 Canada
  • central@ishmii.org